Installation example

Full spead ahead with 170 MW

Cogeneration plant

Meets the requirements acc.to
„Best Available Techniques“
2010/75/EU IED-BAT

170 MW

Total capacity of the installation

Burner

4 x gas burners marathon® M 10003.5 ARZ
6 x dual fuel burners
marathon MC 10003.5 ARZ
DUObloc
LOW-NOx with internal flue gas recirculation ARZ and
external flue gas recirculation ARF

NOx natural gas ≤ 80 mg/Nm3
NOx heating oil ≤ 150 mg/Nm3

Boiler

5 x double flame tube boiler
Viessmann Vitomax D-HW

marathon® burner courier