Installation example

Power plant, NOx < 60 mg/Nm3 acc. to BAT

Combined heat and power plant
District heating Austria

Meets the requirements
„Best Available Techniques“
acc. to 2010/75/EU IED-BAT

97,5 MW

Total capacity of the installation

Burner

6 x gas burners
marathon® M 10003.5 ARZ
DUObloc

LOW-NOx with internal flue gas recirculation ARZ and
external flue gas recirculation ARF

NOx < 60 mg/Nm3 acc. to BAT

Boiler

3 x double flame tube boilers
Viessmann Vitomax D HW

marathon® burner courier

Subscribe for our newsletter!