Best practice
Heat and power plant Berlin
Installation example
Hightech Highlight
40 MW
Total capacity of the installation
Burner
2 x gas burners marathon® M 10003.6 ARZ
DUObloc
LOW-NOx with internal flue gas recirculation ARZ
and external flue gas recirculation ARF
NOx < 60 mg/Nm3
Meets the requirements “Best Available Techniques” acc. to 2010/75/EU IED-BAT
Boiler
Double flame tube boiler
astebo THWZ-IZ
marathon® burner courier
Subscribe for our newsletter!