Installation example

Hightech Highlight

Best practice
Heat and power plant Berlin

40 MW

Total capacity of the installation

Burner

2 x gas burners marathon® M 10003.6 ARZ
DUObloc
LOW-NOx with internal flue gas recirculation ARZ
and external flue gas recirculation ARF
NOx < 60 mg/Nm3

Meets the requirements “Best Available Techniques” acc. to 2010/75/EU IED-BAT

Boiler

Double flame tube boiler
astebo THWZ-IZ

marathon® burner courier